Subfloor insulation Complete!

The completed 2x4 framing for the Tiny House floor was divided effectively into 30 rectangular spaces by joists and blocking pieces installed to stabilize them. These rectangles were of roughly similar lengths and widths, and all were 3.5” deep - the width of a 2x4.  Mikey’s plan called for each space to be filled with rigid foam insulation, to be provided in three layers of 2”, 1” and 1/2” thicknesses… View More

0

"The Grove"

Every house - tiny or huge - needs some kind of a yard, and Michael’s Process Tiny House is no exception.  Long before any pieces of steel were welded to start building the custom trailer, Michael had already designed and created a marvelous little idyll to serve both as a pleasing view from his future residence and as a restful place of respite. Fondly known to him and his family as “The Grove,” this special… View More

0

Insulation Under Tiny House Subfloor Begins

On Monday 6/6/16 Mikey decided to take the day off from work because the weather was great and he wanted to work on Tiny House.  We started on cutting 2” rigid foam insulation pieces to fit into joist cavity spaces. We worked on saw horses set up out by the willow tree (to keep toxic dust away from places where Holly, our Sheltie, hangs out).  He tried using the new Ryobi cordless jig saw; it worked great but the blade was not… View More

0

Not much progress when it rains!

Yesterday and Saturday together, we must have gotten at least 2” of rain - real downpours at times. Whenever that much water collects, whichever one of us is available goes out to the trailer and pumps out all the pools formed on top of the big tarp, within the joist cavities.  The pump works great until its small inlet on the bottom gets clogged with debris (continually dropped by trees above), so I wrapped it in some fabric screening… View More