ProcessHouse

Building a Modern Tiny House in Connecticut
0

Not much progress when it rains!

Yesterday and Saturday together, we must have gotten at least 2” of rain - real downpours at times. Whenever that much water collects, whichever one of us is available goes out to the trailer and pumps out all the pools formed on top of the big tarp, within the joist cavities.  The pump works great until its small inlet on the bottom gets clogged with debris (continually dropped by trees above), so I wrapped it in some fabric screening held by a rubber band, and it clogs less frequently.

We are finally done with all the details of floor framing.  Monday 6/6 is supposed to be clear, and we plan to start cutting pieces of rigid foam insulation and installing them in the joist cavities.
 

Comments: No comments yet

Post a comment