Blocking & Sheathing

After all framing was up, I started on two rows of blocking—pieces of 2x4 material fit between each stud and run horizontally along the length of each wall. Most codes specify that all edges of each panel of sheathing should land on solid blocking. This makes the structure much stronger. This will also give me solid backing to attach my interior plywood to. Because of the height of my walls, I determined that I would need two rows of… View More

3

Problems, problems (Plywood sheathing underway)

Although we had been very meticulous about checking the trailer and subfloor for squareness by measuring full-length diagonals across it, we didn’t - for whatever reasons - do likewise with the raised framing walls.  I think we were lulled into some complacency by several things: (1) the fact that the floor kept appearing to be… View More